Industrial solar at megawatt scale.
From 100 kW sheds to multi-MW plants and open-access projects, MGP brings the electrical licence, HT expertise and in-house manpower to build — and keep running — your plant for 25 years.
उद्योगांसाठी मेगावॅट क्षमतेचा सोलर.
Built around industrial solar.
Large plants reach the lowest cost per kW, delivering power far below industrial grid tariffs for 25 years.
As a licensed electrical contractor (11/22/33 kV), MGP handles the evacuation and HT side in-house.
Off-site solar through open access lets factories with small roofs still go green at scale.
Soiling, string faults and inverter trips cost large plants lakhs a year — our O&M teams prevent it.
Choose the right system.
Industrial rooftop
Metal-sheet, RCC and pre-engineered building roofs — with structural checks.
- Walkways & lifelines
- Fire-safe cabling
- SCADA monitoring
Ground-mount captive
Plants on your own land, connected to your facility.
- Fixed-tilt or tracker
- HT evacuation
- Security & fencing
Open access / group captive
Off-site solar wheeled to your factory under MERC open-access rules.
- For large consumers
- Long-term savings
- Green energy certificates
Own the asset, claim depreciation, maximise savings.
Best for: Strong balance sheet
Long-term power purchase at a fixed tariff — zero investment.
Best for: Cash preservation
Part-own an off-site plant and receive its power.
Best for: Large loads, limited roof
How we deliver your project.
- 1Feasibility
Load, tariff, roof/land and grid study with a bankable generation estimate.
- 2Engineering
Detailed design, structural analysis, SLD, protection and evacuation.
- 3Approvals
DISCOM, CEIG and open-access approvals handled end-to-end.
- 4Execution
Safe, scheduled execution with our own trained, PF/ESIC-covered manpower.
- 525-year O&M
Preventive & corrective maintenance, cleaning, SCADA monitoring and reports.
See your savings instantly.
Estimates use MSEDCL 2026-27 tariffs, ~4 units/kW/day generation, PM Surya Ghar subsidy rules and typical market prices. Your exact design and price come from a free site survey.
Get an exact design, brand options and a fixed price after a free site survey.
Common questions.
Yes. MGP holds an electrical contractor licence covering 11 kV, 22 kV and 33 kV installations and substations.
Maharashtra levies grid support charges on systems above 10 kW. Our financial models include them so the savings you see are realistic.
Get a free industrial solar proposal
Share a few details — our solar engineer will call you back.